Просмотр инструкции снегоходы Ski Doo SUMMIT 2005, страница 957
Section 03 ENGINES (2-STROKE)
Subsection 02 (443 AND 552 ENGINES)
NOTE: Do not use Loctite Primer N with this
sealant. The sealant curing time is similar to the
Loctite 518 without using the Primer N, which is
4to24hours.
Screw all crankcase bolts in place in the following
sequence and to the appropriate torque through a
two steps torquing: first, screw bolts up to 60%
of the final torque (13 N•m (115 lbf•in)forM8
bolts), then, tighten to the required torque (i.e.
22 N•m(16lbf•ft)).
552 Engine
A17C08A
1131
7
913 5
14 10
6
4 2 8 12
TIGHTENING SEQUENCE FOR 552 ENGINE TYPE
443 Engine
10
8 14
4
2
12
6
5
11
31
13
79
A
A
A09C05A
TIGHTENING SEQUENCE FOR 443 ENGINE TYPE
A. 10 N•m(89lbf•in). All the other screws are torqued
to 22 N•m(16lbf•ft)
All Engines
To install magneto, refer to MAGNETO SYSTEM.
BREAK-IN
After rebuilding an engine always observe a break-
in period as described in Operator's Guide.
mmr2005-011 83
Ваш отзыв будет первым