Бесплатные инструкции на русском языке
  • Тип техники
  • Бренд

Просмотр инструкции генератора Fubag HS 5500 ES, страница 12

Fubag
Service plan Service work
Daily
- check the air cleaner
- check oil level and refill to the upper level before
starting the engine.
- check all the points indicated in "PRE-OPERATION
CHECKS".
50 hours (Weekly)
- clean and wash air-cleaner element.
More often if used in dirty or dusty environments.
- change engine oil.(The initial oil change must be
conducted after the 25 hours operation.)
- check spark plug, and clean and adjust if
necessary.
- check and clean the fuel shut-off valve.
100 hours
- replace spark plug
- replace air-cleaner element
- decarbonize cylinder head, valves and piston
- check and replace carbon brushes
300 hours or every year
- inspect control panel components
- check rotor and stator
3 years
- replace engine mount rubber
-overhaulengine
- change fuel lines
- 11 -
www.fubag.ru
Omperator's anual
Preparation and maintenance in winter time
Maintenance in winter time is considered to be the period when the temperature of the ambient air is
fixed below +5 C. The low temperature of the ambient air hampers the engine start, negatively
influences the operation of all its systems. To prepare the generator and provide its further no-failure
operation it is necessary to make the following steps:
- Use up all the old fuel completely, discharge the remaining one.
- Clean the filter of the fuel valve.
- Check the air filter. Change it if necessary.
- Substitute the engine oil for the oil corresponding to the season.
- Fill the fuel tank with the fuel to avoid ingress of water and its further freezing in the fuel
tank and the carburetor.
The generator is to be kept in a place at the temperature from +5 C and above in winter time. If the
engine stops for more than 15 minutes during the operation at negative temperatures it is
necessary to place the set into a warm place to prevent the condensate freezing in the breather pipe
and the throttle before its start. It may cause the pressure boost in the crankcase housing and the
gaskets break down. The monitoring of the set operation is to be carried out oftener than under
usual operating conditions as they are considered to be rough.
O
O
7. Maintenance
Maintenance schedule
Ваш отзыв будет первым
Задайте вопрос
Ваше имя
E-mail
Вопрос*
Ваш вопрос будет опубликован после проверки
Ваш вопрос опубликован

Смотрите также другие инструкции раздела Fubag