Бесплатные инструкции на русском языке
  • Тип техники
  • Бренд

Просмотр инструкции генератора Fubag HS 2500, страница 13

Fubag
- 12 -
www.fubag.ru
Omperator's anual
Note
Items marked with a bold font required advanced skill and tools, so they should be done by
the distributor
Servicing work
Checking electrical safety
Engine oil change
:
Initial oil change should performed after first 25 hours of use. Thereafter change oil every 50 hours.
Before changing oil, check for a suitable way to dispose of the old oil. Do not pour it down into
sewage drains, onto garden soil or into open streams. Your local zoning environmental regulations
will give you more detailed instructions on proper disposal.
Servicing work should only be carried out by personnel qualified for this purpose.All the works listed
in the service plan are to be carried out in accordance with the operating and service instructions for
the motor. We recommend that these works be carried out by an authorized service station.
The electrical safety may only be checked by personnel authorised for this task.
Change engine oil every 50 hours.
(for a new engine, change oil after 25 hour.)
Drain oil by removing the drain plug and the oil filler
cap while the engine is warm Please use a container to
load the used oil for protecting environment.
Reinstall the drain plug and fill the engine with oil
until it reaches the upper level on the oil filler cap
Use fresh and high quality lubricating oil to the specified
quantity.
If contaminated or deteriorated oil is used or the
quantity of the engine oil is not sufficient, the engine
damage will result and its life will be greatly shortened
.
(а)
.
(b)
.
.
Ваш отзыв будет первым
Задайте вопрос
Ваше имя
E-mail
Вопрос*
Ваш вопрос будет опубликован после проверки
Ваш вопрос опубликован

Смотрите также другие инструкции раздела Fubag