Бесплатные инструкции на русском языке
  • Тип техники
  • Бренд

Просмотр инструкции котла BAXI BPI Eco 1.250 / 1.350 / 1.450, страница 33

BAXI
Frequent replenishment water inlets in
the plant.
If the partial or total emptying of the
plant should be necessary.
4.4 ASSEMBLING THE ACCESSORIES
(fig. 5 - fig. 5/a)
The port closing handles and the screw
with knob for the air gate damper regula-
tion is supplied separately, as they can be
damaged during transport.
Both the handles and the screw with knob
are contained in nylon bags inside the ash
collecting tray.
To assemble the handles, proceed in the
following way (fig. 5):
Take a handle (1), insert it in the load
port slot (2) and insert the roll (3) inside
the handle hole; block the handle by
inserting the elastic split pin (4).
Carry out the same operation for the
handle of the ash-pit port.
To assemble the screw with knob, proceed
in the following way (fig. 5/a):
Remove screw M8 x 60 that fastens the
air gate damper to the ash-pit port and
tighten the screw with Bakelite knob (1)
supplied. Place the blind nut with cap (2)
at the end of screw M 10.
Fasten lever M6 (3) to the air gate dam-
per placing it in a horizontal direction on
the right. The lever has an opening at its
end, where the chainlet of the thermo-
static regulator will be connected.
4.5 ASSEMBLING THE CASING
(fig. 6)
From the rear of the boiler, on two upper
tie rods, three nuts are tightened: the
second and the third nut serve to place
correctly the lateral sides of the casing. On
the lower tie rods, both in the front and
rear side of the boiler, two nuts are tighte-
ned, one of which is used to block the side
6
5
1
7
4
2
8
Fig. 6
33
KEY
1 Handle
2 Load port
3 Roll
4 Elastic split pin
Fig. 5
1
2
3
KEY
1 Screw with knob M10 x 70
2 Blind nut with cap
3 Lever M6
Fig. 5/a
Ваш отзыв будет первым
Задайте вопрос
Ваше имя
E-mail
Вопрос*
Ваш вопрос будет опубликован после проверки
Ваш вопрос опубликован